Architects and Contractors

Bird Control Specifications and Prequalification, Ready for Your Bid

CSI 10 81 13 spec support for design teams, and a complete prequalification package for general contractors. Everything you need to specify, bid, and approve BSI.

Why Specify BSI

A specialty subcontractor that only does bird control.

Bird control fails when the wrong product goes on the wrong surface. BSI selects each system based on species, facility type, height, and structural conditions, so the spec matches what actually works in the field.

For general contractors, we carry the compliance load in-house: certified payroll, prevailing wage, OCIP and CCIP enrollment, and multi-state licensing. Tier 1 contractors including Tutor Perini, Hensel Phelps, and Skanska have trusted us on airport, transit, and federal projects.

CSI section
10 81 13, Bird Control Devices
Bonding
$1M per project and $3M aggregate, 2.5% rate
Safety record
Zero OSHA recordables since 2024, EMR 1.0
Prequalification Package

The documents your prequalification team asks for.

Registration

Bird Solutions International, LLC
CAGE Code 13G15, UEI SPK9BV517X35
DUNS 876219838, SAM.gov active
NAICS 561710, FEIN 99-1400235
SBA and GSA certified

Insurance and bonding

General liability $1M/$2M
Automobile liability $1M
Workers compensation $1M
Umbrella $5M
Bonding of $1M per project and $3M aggregate at a 2.5% rate

Safety and compliance

Zero OSHA recordables since 2024
EMR of 1.0
OSHA 10 and OSHA 30 certified crews
Fall protection and aerial lift certified
Certified payroll, prevailing wage, and PLA capable
OCIP and CCIP enrollment and reporting
How We Work With You

From drawings to closeout.

Step 1

Send drawings or photos

Share plans, photos, and the project location, along with the target species if known.

Step 2

Get a system and scope

We recommend the right system for each area and return a scope and price for your bid.

Step 3

Prequalify and submit

We complete your prequalification forms and provide product data and spec sheets for submittals.

Step 4

Install and document

BSI crews install the system and deliver compliance documentation through closeout.

Get a Free Scope

Bidding a project with bird control in the spec?

Request our prequalification package and spec sheets, or send drawings for a recommended system and scope.